Nissan GT-R Forum banner
1 - 11 of 11 Posts

· Your ad here! ;-)
Joined
·
611 Posts
Discussion Starter · #1 ·
I got a light gray interior that i'm looking to re-upholster. Anyone done anything like that, if so, please post some pictures/details and what is a reasonable expectation of the cost.
 

· jbmnsx
Joined
·
335 Posts
I just finished having mine done in ultra suede by Ravi at Umbrella. It came out fantastic although he we slow getting it done. Will be happy to discuss in detail. Email me at [email protected] .

John
 

· Registered
Joined
·
132 Posts
Johns interior was shipped to my shop in two separate batches, first the rear, then the
front, the rear was finished and shipped a full week ahead of schedule. The front was
shipped by John to my shop over two monthes later than his scheduled appointment, and interfered
with other customers jobs which were previously scheduled. Regardless we took in the parts
and finished as quickly as possible. Had the second batch of parts been shipped ontime
And by appt to my shop, all work could have been completed on schedule.

Also willing to discuss in detail 2062297856 or [email protected]

Thanks

Ravi
 

· jbmnsx
Joined
·
335 Posts
In my post I did not intend to give the impression that taking your time is a bad thing. And as Ravi said the timing did get screwed up, I lost both my sister-in-law and my father within a month of each other so I wasn't able to get the parts to Ravi on time. Regardless, Ravi does excellent work and the final product exceeded my expectations.

As far as the timing goes your car is going to be off the road while he does the interior. Work out a schedule with Ravi and you will be very happy with the results.

John
 

· Your ad here! ;-)
Joined
·
611 Posts
Discussion Starter · #5 ·
Thanks guys, I'm actually in the process of getting the 2nd set of seats, so that car won't be off the road for long and to have oem for later resale.
 

· Your ad here! ;-)
Joined
·
611 Posts
Discussion Starter · #9 ·
wow. all I could think of when I saw that was....

 

· Your ad here! ;-)
Joined
·
611 Posts
Discussion Starter · #10 ·
Johns interior was shipped to my shop in two separate batches, first the rear, then the
front, the rear was finished and shipped a full week ahead of schedule. The front was
shipped by John to my shop over two monthes later than his scheduled appointment, and interfered
with other customers jobs which were previously scheduled. Regardless we took in the parts
and finished as quickly as possible. Had the second batch of parts been shipped ontime
And by appt to my shop, all work could have been completed on schedule.

Also willing to discuss in detail 2062297856 or [email protected]

Thanks

Ravi
Hey Ravi, thanks for reaching out - however, checking into shipping costs, it would run me $1K just for shipping back/forth and would not be the most cost effective option.
 
1 - 11 of 11 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top